Cabinet Hardware for Kitchen Refacing Companies (2026)

Cabinet Hardware for Kitchen Refacing Companies (2026)

Cabinet hardware for kitchen refacing companies is the knobs, pulls, hinges, and appliance pulls used to finish new door and drawer fronts while the existing cabinet boxes stay in place, with the aim of protecting install speed and job margin. Refacing crews work under different constraints than a homeowner buying one set of pulls: they're matching hole spacing across dozens of doors at once, juggling multiple finish lines per job, and pricing hardware into a bid before demo day.

TL;DR
  • Cabinet hardware for kitchen refacing companies should match existing hole spacing first, finish second, to avoid redrilling doors mid-job.
  • 96mm, 128mm and 160mm center-to-center are the three spacing standards that cover most refacing jobs in 2026.
  • Knobs.co carries trade pricing and 50,000+ SKUs across brands, useful for matching finish lines across multiple units.
  • A $12.96 drill template beats eyeballing pull placement on a 20-door refacing job every time.
Common pull spacing standards
96mm
Common cc spacing on smaller doors
128mm
Standard cabinet door pull spacing
160mm
Common drawer and appliance pull spacing

Why cabinet hardware matters for kitchen refacing companies

Refacing swaps doors and drawer fronts but keeps the box, which means every hole already drilled on the old hardware is a fixed constraint on the new hardware. Get the center-to-center spacing wrong on even a handful of doors and you're filling holes, staining touch-up spots, and eating into the labor budget you quoted.

Buying bulk cabinet hardware for contractors and builders in project-sized runs, rather than one-off retail packs, is what separates a refacing company that hits its install date from one that's back at the store mid-week for three more pulls in the wrong finish.

Cabinet hardware decisions for kitchen refacing companies also compound across a season. A crew running four to six refacing jobs a month in 2026 isn't buying one set of knobs — they're buying the same spacing and finish logic over and over, and small mistakes get expensive at that volume.

Audit existing hole spacing before you quote

Measure before you price the job. The manual way costs nothing but a tape measure and ten extra minutes per kitchen.

  • Record center-to-center (cc) spacing on every door and drawer front before demo
  • Flag any doors using non-standard spacing outside 96mm, 128mm, or 160mm
  • Note single-hole knob mounts separately from two-hole pull mounts
  • Photograph hardware placement before removal in case the client wants to keep the layout
  • Mark any stripped or oversized holes that will need a backplate to cover

Decide whether to reuse holes or add backplates

Matching new hardware to old hole spacing avoids a full redrill. When the new door style calls for a longer pull, a backplate covers the mismatch without patching wood.

  • Choose the same cc spacing as the existing hardware whenever the design allows it
  • Use a backplate to bridge a spacing gap instead of filling and redrilling
  • Confirm backplate width covers any visible witness marks from the old hardware
  • Reserve full redrills for jobs already replacing hinges and needing new holes anyway
  • Price the extra 10-15 minutes per door that redrilling adds to the labor line

Lock in trade pricing and stock levels for the job size

Once spacing is confirmed, order against the actual door count, not a rough guess. This is where a trade account starts paying for itself.

  • Check trade pricing programs for interior designers and contractors before you commit to a supplier for the season
  • Confirm stock depth on the exact SKU across the full door count, not just a sample quantity
  • Order 5-10% over count to cover install mistakes and future service calls
  • Ask about lead times separately for pulls, knobs, and hinges — they don't always ship together

Knobs.co stocks over 50,000 SKUs across major hardware brands, which matters for refacing companies matching a finish line a client saw in a showroom. The tradeoff: you're ordering online, not walking a trade counter same-day, so lead time planning still matters for tight install schedules.

Match pull length and finish to the new door style

Finish and pull length decisions happen after spacing is locked, not before. Shaker doors, flat-front slabs, and inset styles all pull toward different proportions.

  • Size pull length to roughly one-third the door width for a balanced look
  • Match appliance pull finish to cabinet pulls, not to the appliance itself, unless the client asks otherwise
  • Confirm bar pulls and appliance pulls in the same finish line ship from the same batch to avoid tone mismatch
  • Order one physical sample per finish before locking a 20-plus door order

A bar pull like the Jeffrey Alexander Griffin 128mm bar pull works on standard 128mm spacing common to most face-frame refacing jobs — buy it for jobs where the old hardware already sits at 128mm cc, skip it if the client wants an oversized modern pull instead.

Prep install day with the right jig, template, and screws

A crew drilling forty doors by hand loses time and consistency. A template turns that into a repeatable five-second step per door.

  • Use a drill template matched to your chosen cc spacing rather than measuring each door by hand
  • Confirm screw length against door thickness before the crew starts — see how to choose the right screw length for cabinet hardware
  • Stage hinges separately from pulls so install crews aren't sorting boxes mid-job
  • Pack extra screws in the exact finish ordered — mismatched screw heads show under kitchen lighting
Jig and template picks for refacing crews
Mounting Templates Collection Cabinet Door Concealed Hinge Mounting Kit
Clear blue hinge mounting kit with 1-3/8 inch Forstner bit for consistent concealed hinge placement.
$27.20
Retail Pack Hardware Drill Template With 3/16 Drill Bit
Drill template with 3/16 inch bit for consistent, repeatable hardware placement across multiple doors.
$12.96

Order hardware in project batches, not one-offs

One-off ordering is the single biggest source of finish mismatch on refacing jobs. Batch ordering against the door count fixes this before it becomes a callback.

  • Order the full door and drawer count in one purchase, including spares
  • Split the order by hardware type (knobs, pulls, hinges, appliance pulls) so nothing ships partial
  • Track lot or batch numbers on finished metal hardware — tone can shift slightly between production runs
  • Hold 5% of the order in reserve stock for post-install service calls

Comparison: sourcing options for refacing companies

Option Best for Starting price Key limitation
Big-box home center Single-unit or emergency jobs Varies by store Limited cc spacing options, no trade account
Manufacturer direct Matching one specific finish line Varies by minimum order Minimum order quantities, longer lead times
Knobs.co (cabinet hardware specialist) Multi-door refacing jobs needing cc matches across brands Trade pricing varies by account Online ordering only, no walk-in counter
Drill template / hinge jig kit Crews cutting new holes on refaced doors $12.96 Doesn't include the pull, knob, or hinge itself

Verdict: for a full-kitchen refacing job with 20+ doors, Knobs.co's trade pricing and multi-brand stock beat a big-box run on spacing consistency; for a single emergency door, a big-box store still wins on speed.

Common mistakes kitchen refacing companies make

  • Ordering doors and hardware from different vendors without confirming cc spacing first — the door style dictates spacing, and finding out after delivery means a redrill
  • Skipping a physical sample before a 20-plus door order — finish reads differently under kitchen LED lighting than on a screen
  • Underestimating appliance pull demand — appliance pulls come in different lengths (12-inch and 14-inch drill centers are common on refrigerator and oven panels) and get left off the initial count
  • Not setting a trade account before the busy season — waiting until March 2026 to negotiate pricing means missing volume tiers on the year's biggest run of jobs
  • Reusing screws from the old hardware — screw length has to match new door thickness, not the old one

FAQ

What is the best cabinet hardware for kitchen refacing companies in 2026?

There's no single best pull or knob — the right choice matches the existing hole spacing (commonly 96mm, 128mm, or 160mm) to the new door style. Knobs.co's multi-brand catalog and trade pricing make it easier to match spacing and finish across a full refacing job in 2026.

Do refacing companies need to redrill cabinet holes for new pulls?

Not if the new hardware matches the existing center-to-center spacing. Redrilling is only necessary when the new door style calls for different spacing or when old holes are stripped or oversized.

What cc spacing is most common for kitchen cabinet pulls?

96mm, 128mm, and 160mm cover most standard cabinet doors and drawers. Appliance pulls often use longer spacing, commonly in 12-inch and 14-inch drill-center options.

Can kitchen refacing companies get trade pricing on cabinet hardware?

Yes — trade pricing programs exist for contractors and designers buying in volume. Setting up an account before the busy season protects pricing on the year's biggest jobs.

What's the difference between a bar pull and an appliance pull for refacing jobs?

A bar pull is sized for cabinet doors and drawers, while an appliance pull is a longer bar built for refrigerator, oven, or dishwasher panels. Finish should match across both for a refaced kitchen to read as one design.

Is a drill template worth it for a refacing crew?

Yes on any job with more than a handful of doors. A template locks in consistent spacing across every door, which is faster and more reliable than measuring each one by hand.

How much does cabinet hardware cost for a full kitchen refacing job?

Cost depends on door count, hardware type, and finish, and varies by supplier and order size. Checking current trade pricing before quoting a job is the only reliable way to price it.

One last thing

Appliance pulls trip up more refacing bids than any other single item because they're easy to forget in the initial door count — a 30-inch appliance pull for a wall oven panel is a different spec entirely from a 12-inch pull on a dishwasher front, and ordering the wrong length means a redo on install day. Build the appliance pull count into the very first walkthrough, not the final order.